top of page


Effective Strategies for Exterior Remediation at Occupied Multifamily Properties
Successful multifamily remediation requires more than a technical repair. Owners must coordinate phasing, residents, access, temporary protection, concealed conditions, budgets, and daily operations.
Armando Diaz
Jul 133 min read


From Investigation Report to Executable Remediation Plan
A sound building-envelope report identifies the failure. The next challenge is turning those findings into a defined scope, realistic budget, occupied-building phasing plan, and contractor-ready path to construction.
Armando Diaz
Jul 133 min read


Before Destructive Testing Begins: A Field Guide for Construction-Defect Counsel
Controlled destructive testing can reveal how an exterior wall failed—but only when openings are carefully selected, documented, protected, and coordinated. Here is what construction-defect counsel should understand before field investigation begins.
Armando Diaz
Jul 133 min read


Effective Facade Risk Management: Steps to Mitigate Facade Failure Risks
A key part of facade risk management is recognizing common causes of failure. These include water infiltration, material degradation, structural movement, and installation errors. Each of these factors can compromise the facade’s integrity if not addressed properly.
Armando Diaz
Apr 214 min read
bottom of page
