Project Overview

Apex Construction Systems responded to an exterior-façade safety concern at an operating luxury department store in Overland Park, Kansas. EIFS components at the building corners were separating from the wall above public areas, requiring immediate stabilization, documentation, and a coordinated path to reconstruction.


The work progressed from emergency removal of unstable material to an approved reconstruction scope for the affected EIFS field and decorative shapes above the south entrance. The response balanced public safety, protection of the operating storefront, accurate reconstruction of architectural details, and close coordination with store and property-management teams.


Project Profile

  • Property type: Operating luxury department store

  • Location: Overland Park, Kansas

  • Project phase: Emergency stabilization followed by EIFS reconstruction

  • Primary area: South entrance and adjacent façade corners


Emergency Conditions

  • EIFS corner components were visibly pulling away from the wall above customer-facing areas

  • A second loose section was identified during the initial response and removed as a safety precaution

  • Incoming weather required equipment, debris removal, and cleanup to be sequenced carefully

  • Store operations, pedestrian separation, and protection of adjacent finishes had to remain central to the response


Emergency Stabilization Approach

  • Established a controlled work area and coordinated aerial-lift access

  • Removed unstable EIFS pieces at the affected corners to reduce immediate falling-material risk

  • Inspected adjacent areas for additional movement and documented conditions with field photographs

  • Maintained direct communication with the owner and property-management team as conditions changed

Ready to start your remediation project?

When it comes to protecting your real estate investment, you need a partner you can trust to manage risk and deliver lasting results. Our team of remediation experts brings decades of experience to help identify issues early, recommend practical solutions, and execute with precision. Call or email our team today to protect your real estate investment with confidence.

Berkley Riverfront - Before_edited.jpg

Reconstruction Scope

  • Reconstruct approximately 641 square feet of 1-1/2-inch EIFS with compatible adhesive, reinforcing mesh, base coat, mechanical attachment, and finish

  • Recreate approximately 109 linear feet of custom EPS cornice and sill profiles from the documented exterior details

  • Install approximately 20 linear feet of metal flashing at the affected entrance area

  • Review exposed substrate and existing fluid-applied air-barrier conditions before covering the assembly


Matching Architectural Shapes, Color, and Texture

The façade included custom decorative shapes that had to be accurately rebuilt rather than replaced with generic trim. Apex used the original exterior details to define the cornice and sill profiles. A removed EIFS sample was also sent for color matching, and the finish color was verified against the original plans as Stowe White. The reconstruction scope called for a compatible medium-sand finish and the closest practical match to the existing weathered façade.


Occupied-Retail Execution

  • Protect the storefront, paving, adjacent finishes, and pedestrian routes below the work

  • Coordinate access and sequencing around normal store and mall operations

  • Keep the work area orderly, weather-ready, and separated from the public

  • Document concealed conditions and obtain authorization before expanding beyond the agreed scope


Owner Decision Value

This project demonstrates how an emergency façade response can become a controlled reconstruction plan. Immediate stabilization reduced public risk, while field documentation, original-plan review, material matching, and detailed estimating created a defensible path for rebuilding the affected EIFS assembly and architectural profiles.


Capabilities Applied

  • Emergency façade stabilization and selective removal

  • EIFS reconstruction and custom EPS profile fabrication

  • Color and texture matching

  • Flashing and air-barrier coordination

  • Occupied-retail access, protection, and communication


Why Apex Construction Systems

Apex combines responsive emergency action with the planning discipline required for permanent façade reconstruction. The same team can secure unstable materials, document changing conditions, rebuild specialized details, coordinate matching finishes, and manage work around an active commercial property.

Ready to start your remediation project?

When it comes to protecting your real estate investment, you need a partner you can trust to manage risk and deliver lasting results. Our team of remediation experts brings decades of experience to help identify issues early, recommend practical solutions, and execute with precision. Call or email our team today to protect your real estate investment with confidence.